MIL-DTL-15011K
Table 3. Requirement/verification cross-reference matrix - Continued
Section 3 Requirement
Verification Methods
Verification
Section 4 Verification
Class
N/A
1
2
3
4
A
B
Style 1, 1A, 1B pallet fasteners
X
X
X
4.3.4
Construction
X
-
Design and construction
X
X
X
4.3.4
Component details
X
-
Deck boards
X
X
X
4.3.4
Stringer boards
X
X
X
4.3.4
Posts
X
X
X
4.3.4
Assembly
X
-
Component placement
X
X
X
4.3.4
Assembly tolerances
X
X
X
4.3.4
Fastener locations
X
X
X
4.3.4
Identification
X
X
X
4.3.4
Manufacturers marking
X
X
X
4.3.4
Preservative marking
X
X
X
4.3.4
ISPM-15 marking
X
X
X
4.3.4
Workmanship
X
X
X
4.3.4
Transportability
X
X
X
4.3.4
4.1. Classification of inspections. The inspection requirements specified herein are classified as
follows:
a. First article inspection (see 4.2)
b. Conformance inspection (see 4.3)
4.1.1. Verification conditions. Unless otherwise specified, all verifications shall be performed in
accordance with the test methods and conditions specified in section 4.4.
4.1.2. Classification of characteristics. For examinations and tests cited herein or when required
by contract; critical, major, and minor characteristics are defined in MIL-STD-1916.
4.2. First article inspections. When specified, (see 6.3) a first article inspection shall be preformed
when a first article sample is required (see 3.1). The first article sample shall consist of three
consecutively produced pallets of one grade, type and style (see Figure 5, Figure 6, or Figure 7 as
applicable) which has been produced using the same production processes, procedures and equipment as
will be used in fulfilling the contract. These sample pallets shall be manufactured within 30 days of
inspection. All materials shall be obtained from the same sources of supply as will be used in regular
production.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business